UP-McKee Hall Improvements
HVAC

Bid Date / Prevailing Time
Package Number
13
Pre-bid Date/Time
Pre-Bid Location
Meet at the rear loading dock of McKee Hall 10 minutes prior to start. Sign-in is required.
Pre-Bid Meeting
Recommended but not Mandatory
Awarded To
Hranec Corporation

Poole Anderson will manage all bids through the Building Connected site, which can be accessed directly through the following link https://app.buildingconnected.com/login or via the Poole Anderson website https://www.pooleanderson.com/subcontractors/

Document Distribution
Document Cost
0.00
Document Distribution Method
Through Building Connected
Anticipated Document Delivery