UP-McKee Hall Improvements

Project Number
00-10054.00
Project Status
Trade/Bid Packages
Campus
University Park
Project Description

The McKee Hall Improvement project includes bathroom renovations and the addition of additional bedrooms. Additional scope includes the renovation of the community kitchen, replacement of all corridor flooring, replacement of the building's fire alarm system, renovation of three existing single rooms with private bathrooms, conversion of a storage room into a new student lounge, and replacement of the side entrance stairs with a new exterior ramp.

Penn State Project Leader Name, Email
Architect/ Engineer and Design Build Selection
Capital Project (>$10M)
No
Professional Consultant
Company Name
Hoffman Leakey Architects LLC
Contact Name
Robert Miller
Phone
(814) 466-7811
Construction Manager Selection and Other Services
CM Firm
Company Name
Poole Anderson Construction, LLC
Contact Name
Eli Manges
Phone
(814) 272-4534
Trade/Bid Package Information
Project Stage for Trade/Bid Package Information
Waiting for Award
Prequalification

The Poole Anderson prequalification form can be found in the Front-End Documents posted on the Building Connected project page, once it is released on 9/15/2025. The document can also be requested directly by contacting Eli Manges at [email protected].

Additional Information

Poole Anderson will manage all bids through the Building Connected site, which can be accessed directly via the following link: https://app.buildingconnected.com/login or through the Poole Anderson website at https://www.pooleanderson.com/subcontractors/.

Bid Due Date and Time
Package Number Package Name Pre-Bid Date/Time Pre-Bid Meeting Bid Date/Time Awarded To Document
15 Doors, Frames, Hardware
16 Division 10 (furnish and install)
01 Select Demo and Abatement Mandatory
02 Misc Metals Recommended but not Mandatory
03 General Trades Recommended but not Mandatory
04 Millwork and Casework Recommended but not Mandatory
05 Spray Foam Insulation Recommended but not Mandatory
06 Door, Frame, Hardware - Material Recommended but not Mandatory
07 Walls and Ceilings Recommended but not Mandatory
08 Wall and Floor Tile Recommended but not Mandatory
09 Resilient Flooring Recommended but not Mandatory
10 Painting and Wallcoverings Recommended but not Mandatory
11 Fire Protection Recommended but not Mandatory
12 Plumbing Recommended but not Mandatory
13 HVAC Recommended but not Mandatory
14 Lighting and Electrical Recommended but not Mandatory