WS-General-Step Replacement
The project will remove the existing site stairs and retaining walls adjacent to the SLC Building. The new stair/railing assembly will be a reduction in width from what currently exists, it will increase the number of landings, and adjust the connection to the SLC Building. Timber walls will be removed, and grading/landscaping will be revised. A new landscape block wall will be installed at the bottom of the stairs. At the adjacent Multi-Purpose Building, timber walls will be removed, and grading/landscaping will be adjusted. New landscape block walls will be installed.
The prime contractor must be PSU prequalified in General Construction.
Bids will be received electronically only through the Trimble Unity Construct Bid Portal. Bids will not be accepted in any other format.
| Package Number | Package Name | Pre-Bid Date/Time | Pre-Bid Meeting | Bid Date/Time | Awarded To | Document |
|---|---|---|---|---|---|---|
| 001 | General Construction | Recommended but not Mandatory |