Tyson Building HVAC Upgrades and Roof Replacement
- Completion - August 2015
- BOT Approved Amount - $8,000,000
SCOPE:
This was a roof replacement project and a building system upgrade to improve performance and save energy. Scope included: two new air-handling units to serve the entire building and a new hot water plant located within the building. Further work included: insulated ductwork, controls upgrades, pipe replacement, connection to campus chilled water system, electrical modifications, and new corridor LED ceiling lights.
Gallery: