Project will bid in three phases:

  • Advanced Steam Line
  • 50% CD Package
  • 100% CD Package
PSU Project Leader: 
Prequalification: 

Bidders must be prequalified by Clayco, the Construction Manager, to bid this project. Contact for prequalification by Clayco is Karen Mayes, Email [email protected]

Professional Consultant
Company Name: 
DLA+ Architects
Contact Name: 
John Nolan
Address: 
Foster Plaza 9, Suite 200, 750 Holiday Drive, Pittsburgh, PA 15220
Phone: 
(412) 921-4300
CM Firm
Company Name: 
Clayco
Contact Name: 
Karen Mayes
Address: 
2199 Innerbelt Business Center Drive, Saint Louis, MO 63114
Phone: 
(814) 468-1046
Document Distribution
Company Name: 
Clayco, Inc.
Contact Name: 
Jennifer Piekarski
Address: 
2199 Innerbelt Business Center Drive, St. Louis, MO 63114
Phone: 
(312) 229-6425
Construction Description: 

100% CD Package:

Project scope includes construction of a 118,888 SF seven-story new residence hall New Building B, renovations of two (2) buildings: 66,986 SF eight-story residence hall (McKean & Pennypacker Halls) as well as work within existing Johnston Hall (dedicated to Phase 1B building scope) and the project site work associated with Phase 1B.

Construction of the Phase 1B Scope of Work will begin on March 6, 2017 and will complete on August 10, 2018.

 

50% CD Package:

Project scope includes the scope of work required to support construction of a 118,888 SF seven-story new residence hall New Building B and renovations of two (2) buildings: 66,986 SF eight-story residence hall (McKean & Pennypacker Halls) as well as work within existing Johnston Hall (dedicated to Phase 1B building scope) and project site work is to be included.  

Construction of the Phase 1B Scope of Work will begin on March 6, 2017 and will complete on August 10, 2018.

 

Advanced Steam Line Package:

Project Scope includes the advanced steam line scope of work required to suppport construction of a 118,888 SF, seven-story residence hall, New Building B and renovations of two (2) buildings: 66986 SF, eight-story residence hall (McKean & Pennypacker Halls) as well as work within existing Johnston Hall (dedicated to Phase 1B building scope) and project site work to be included.

Construction of the Advanced Steam Line Scope of Work will begin October 31, 2016 and will complete on February 7, 2017.

 

Previous Bid Packages
Package Number Title Anticipated Document Delivery Pre-Bid Date/Time Pre-Bid Meeting Bid Date/Time Awarded To Document
32 - 100% CD Package Asbestos Abatement 11/11/2016 01/05/2017 1:00 PM Mandatory 01/19/2017 3:00 PM Plymouth
08 - 100% CD Package Elevator 11/11/2016 No pre-bid 12/08/2016 3:00 PM Port Elevator
09 - 100% CD Package Earthwork / Site Utilities 11/11/2016 No pre-bid 12/08/2016 3:00 PM Hawbaker
10 - 100% CD Package Deep Foundations 11/11/2016 No pre-bid 12/08/2016 3:00 PM
11 - 100% CD Package Site Concrete 11/11/2016 No pre-bid 12/08/2016 3:00 PM Hawbaker
12 - 100% CD Package Concrete Foundations and Flatwork 11/11/2016 No pre-bid 12/08/2016 3:00 PM
13 - 100% CD Package Structural Steel 11/11/2016 No pre-bid 12/08/2016 3:00 PM Altoona Pipe & Steel
14 - 100% CD Package Masonry and Masonry Restoration 11/11/2016 No pre-bid 12/08/2016 3:00 PM Cost Masonry
15 - 100% CD Package Glass & Glazing 11/11/2016 No pre-bid 12/08/2016 3:00 PM Nittany Building Specilaties
16 - 100% CD Package Dry Wall, EIFS, Plaster Repair & ACT 11/11/2016 No pre-bid 12/08/2016 3:00 PM JC Orr & Son, Inc.
17 - 100% CD Package Rough Carpentry, Finish Carpentry & Millwork 11/11/2016 No pre-bid 12/08/2016 3:00 PM
18 - 100% CD Package Waterproofing, Air Barrier and Below Grade Insulation 11/11/2016 No pre-bid 12/08/2016 3:00 PM JC Orr & Son, Inc.
19 - 100% CD Package Sealants 11/11/2016 No pre-bid 12/08/2016 3:00 PM
20 - 100% CD Package Roofing, Sheet Metal & Metal Composite Panels 11/11/2016 No pre-bid 12/08/2016 3:00 PM R.H. Marcon
21 - 100% CD Package Fireproofing 11/11/2016 No pre-bid 12/08/2016 3:00 PM JC Orr & Son, Inc.
22 - 100% CD Package Doors, Frames, Hardware 11/11/2016 No pre-bid 12/08/2016 3:00 PM HC Hood Co.
23 - 100% CD Package Flooring 11/11/2016 No pre-bid 12/08/2016 3:00 PM Nittany Building Specialties & J.P. Phillips
24 - 100% CD Package Painting 11/11/2016 No pre-bid 12/08/2016 3:00 PM
25 - 100% CD Package Asphalt 11/11/2016 No pre-bid 12/08/2016 3:00 PM Hawbaker
26 - 100% CD Package Landscaping 11/11/2016 No pre-bid 12/08/2016 3:00 PM
27 - 100% CD Package Specialties 11/11/2016 No pre-bid 12/08/2016 3:00 PM
28 - 100% CD Package Residential Equipment 11/11/2016 No pre-bid 12/08/2016 3:00 PM
29 - 100% CD Package Window Treatment 12/08/2016 No pre-bid 12/08/2016 3:00 PM
30 - 100% CD Package Final Cleaning 11/11/2016 No pre-bid 12/08/2016 3:00 PM
31 - 100% CD Package Demolition 11/11/2016 No pre-bid 12/08/2016 3:00 PM Interior Specialists
03 - 50% CD Package Plumbing 10/03/2016 No pre-bid 10/27/2016 3:00 PM Worth
04 - 50% CD Package Fire Protection 10/03/2016 No pre-bid 10/27/2016 3:00 PM S.A. Comunale
05 - 50% CD Package Mechanical 10/03/2016 No pre-bid 10/27/2016 3:00 PM Farfield
06 - 50% CD Package Electrical 10/03/2016 No pre-bid 10/27/2016 3:00 PM The Howard Company
07 - 50% CD Package Cold-Formed Meal Framing 10/06/2016 No pre-bid 10/27/2016 3:00 PM FRAMECO
01 - Advanced Steam Line Package Earthwork & Site Utilities 09/29/2016 No pre-bid 10/18/2016 3:00 PM R.C. Bowman
02 - Advanced Steam Line Package Mechanical 09/29/2016 No pre-bid 10/18/2016 3:00 PM G.R. Sponaugle