Cedar Hall HVAC Upgrades - Phase 2
Project includes replacement of 210 Fan Coil Units (FCUs furnished by PSU) and associated re-wiring to Onity Controllers; addition of three make-up air systems consisting of Exhaust fans, Energy Recovery Units and four pipe Air Handling Units (ERVs and AHUs furnished by PSU); addition of six louvered cupolas and attic equipment platforms and associated general construction; addition of condensing boilers; modification to the existing dual temp water system to add glycol and VFDs and a dedicated pump for the AHU cooling coils; exhaust system modifications; and replacement of four existing split DX units.
Pre-bid Note
Registration is required for the virtual pre-bid meeting via Zoom. Register at: https://entecheng.zoom.us/webinar/register/WN_fjV2FvY7QSCQmKW4QXn8BA
After registration, registrants should receive a confirmation e-mail with instructions for attendance. Questions or issues with registration can be directed to Entech Engineering, Inc. at the following e-mail address: [email protected]
Bidding Documents
For purposes of this Bid, all bidders must be addeed to e-Builder by Penn State. please disregard the Create Account feature on the e-Builder Login page.
Bidding documents must be obtained through the e-Builder Bid Package. To request Bid Package access, complete the eB Company Contact Template (scroll to Excel Document below) and email it to [email protected] In the Subject Line of your email, please type "Request Access, PSU 06905, AL Cedar HVAC" The Contact’s email address that is provided on the Template must be associated with a person. Bid Access won’t be created for a departmental or corporate email address. Bid Package Access is not immediate. Please allow time for Penn State to process your Request. When your Request is complete, a Bid Notification will be sent. The Bid Notification provides access to the Bid Package, including all bid documents and the ability to submit a proposal.