- Accident Reporting
- Asbestos
- Automated External Defibrillator (AED) Program
- Barricades
- Biohazards
- Chemical
- CPR First Aid
- Electrical
- Emergency and Fire
- Equipment
- Facility Space Management
- Fiberglass
- Fluorescent Lights
- Food Borne Illness
- Fume Hood Fans, Ducts, and Motors
- General Safety
- Glass
- Hazardous Materials
- Laboratory Safety
- Lead
- Personal Protective Equipment
- Radiation
- Restricted Entry Areas
- Room 27/28 ASI
- Elevator Rescue/Shaft Access
- University Park Greenhouses(Pesticides)
- OPP Carpentry Shop
- Poultry Research Farm (Entry Procedures)
- Carpenter Building Crawlspace (Entry Procedures)
- Ceramics Building Mezzanine Fan Room
- Chandlee Rooms 13 and 13A
- SOP for ADL Incinerator Building
- Fenske Pilot Plant Entry Procedures
- Roof of Dieke Building
- Airport Security and Safety
- SOP for Wiley Animal Containment Facility
- Animal Facilites on Campus
- Barrier Facility Access Procedures at the Animal Behavioral Lab
- Confined Space Entry Procedure
- Cedar Building
- Livestock Research Farms
- Restricted Entry Areas
- Sign In Procedure for the West Campus and East Campus Steam Plant Operations
- Right to Know
- Safety Committee
- Safety Concerns - Animal Areas
- Utilities
- Vehicles
- Welding and Cutting
- Winter Safety
Restricted Entry Areas
Purpose:
To identify locations of the University that require special procedures to be followed before entry to the areas can be gained by Physical Plant personnel.
Policies and Procedures:
Special procedures must be followed by Physical Plant personnel before entering the following areas of campus. Check with the appropriate supervisor to obtain the procedure(s) for each area.
- Animal Facilities
- Barrier Facility
- Wiley Animal Containment
- Breazeale Nuclear Reactor Building
- Confined Spaces (including Utility tunnels and manholes)
- Dining Halls
- Residence Halls
- Housing and Food Services Building
- Stone Valley Facilities
- University Park Airport
- Roof of Deike Building (See Policy in this Manual)
- Bioprocessing Pilot Plant-Room 57, Fenske (See Policy in this Manual)
Date of Policy:
November 4, 1994
