Section 23 21 23
Replace current section in its entirety to include new requirements of general design and installation.
Section 25 90 00
Add a new document describing the sequences of operation necessary to accomplish the HVAC functions of the Enterprise Utility Management System (EUMS).
Section 23 70 00
Update air handler requirements regarding efficiency, system reliability, redundancy, identification, fan arrangement considerations, proper mixing, bearings, dampers, and referencing the sequence of operations.
Section 13 21 00
Modify minimum face velocity and component requirements of hoods in radioisotope laboratories.
Section 23 21 23
Update requirements of flexible pump couplings for Base Mounted End Suction Pumps and Base Mounted Double Suction Pumps.