Division 00
00 00 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 20 00 INSTRUCTIONS FOR PROCUREMENT
00 21 00 FRONT ENDS NON-DGS PROJECTS
These specifications are provided for insertion into the Project Manual of all bid projects. The design Professional must include the entire document (sections A-H). In some of the sections you will be required to make some project specific selections, instructions are contained within the document. These selections should be discussed with the Project Manager. Sections C and D (also the CM General Conditions) are samples provided for your information and should not be edited. Your Project Manager will provide a clean copy of section D (General Conditions) to you for incorporation into the specifications. You should include the "sample" contract in the specifications. The Professional is also responsible for coordinating the information in these documents with their own specifications.
| Document |
Version |
Description |
|---|---|---|
| Section A | January 2009 |
Notice to Bidders |
| Section B |
January 2009 |
Form of Proposal |
| Section C |
March 2009 |
Form of Agreement 1-C (sample) |
| Section D |
January 2009 |
General Conditions of the Contract (sample) |
| Section D1 |
October 2001 |
Notification of Contract Requirements Pertaining to the Prevailing Wage Act |
| Section E |
October 2001 |
List of Drawings |
| Section F (UP) |
January 2009 |
General Conduct of the Work and Special Requirements |
| Section F (non-UP) |
January 2009 |
General Conduct of the Work and Special Requirements |
| Section G |
October 2001 |
Basis of Bids |
| Section H |
October 2001 |
Scope of Work |
| MBE-WBE Exhibit A | January 2009 |
00 22 00 FRONT ENDS DGS PROJECTS
These specifications are provided for insertion into the Project Manual of all bid projects. The design Professional must include the entire document (sections A-H). In some of the sections you will be required to make some project specific selections, instructions are contained within the document. These selections should be discussed with the Project Manager. Sections C and D (also the CM General Conditions) are samples provided for your information and should not be edited. Your Project Manager will provide a clean copy of section D (General Conditions) to you for incorporation into the specifications. You should include the "sample" contract in the specifications. The Professional is also responsible for coordinating the information in these documents with their own specifications.
| Document |
Version |
Description |
|---|---|---|
| Section A (DGS) |
January 2009 |
Notice to Bidders |
| Section B (DGS) |
January 2009 |
Form of Proposal |
| Section C (DGS) |
March 2009 |
Form of Agreement 1-C (sample) |
| Section D |
January 2009 |
General Conditions of the Contract (sample) |
| Section D1 |
October 2001 |
Notification of Contract Requirements Pertaining to the Prevailing Wage Act |
| Section E |
October 2001 |
List of Drawings |
| Section F (UP) |
January 2009 |
General Conduct of the Work and Special Requirements |
| Section F (non-UP) |
January 2009 |
General Conduct of the Work and Special Requirements |
| Section G |
October 2001 |
Basis of Bids |
| Section H |
October 2001 |
Scope of Work |
| DGS Exhibits A-H |
January 2007 |
Exhibit A: Nondiscrimination Clause; Exhibit B: Contractor Integrity Provisions; Exhibit C: Contractor Responsibility Provisions; Exhibit D: Tax Liability Provisions; Exhibit E: Trade Practices Act Contract Clause; Exhibit F: Steel Products Procurement ACT Contract Clause; Exhibit G: Public Works Contractor's Bond Law of 1967 Contract Clause; Exhibit H: Pennsylvania Prevailing Wage Act Contract Clause. |
| DGS Exhibit I |
January 2007 |
Minority Business and Women Business Enterprise Participation |
| DGS-SGC |
February 2005 |
Supplementary General Conditions of the Contract |
| MBE/WBE Subcontractor and Supplier Certification, Solicitation and Commitment Form |
August 2004 |
Form GSMWBE-16 (Form 16), is comprised of two parts: 16A - Certification and 16B - Record of MBE/WBE Solicitations and Commitments. |
00 30 00 JOB KIT
.01 Job Conference Guide
| Document | Version Date |
Description |
|---|---|---|
| Initial Job Conference Guide |
May 2008 |
This interactive guide serves only to highlight certain contract administration requirements. This online guide contains links to all of the job kit documents (below). |
.02 Forms for Job Conference
| Document | Version Date |
Description |
|---|---|---|
| Job Conference Sign-in Sheet |
December 2007 |
Use this form to log the attendees of the job conference |
| Job Conference Meeting Minutes Form |
December 2007 |
|
| After Hours Emergency Calls |
April 2007 |
.03 Prevailing Wage (Payroll)
| Document | Version Date |
Description |
|---|---|---|
| Commonwealth of PA Payroll Certification Notice |
May 2008 |
|
| Weekly Payroll Certification Forms |
||
| No Work Report |
July 15, 2003 |
.04 Payment Application
| Document | Version Date |
Description |
|---|---|---|
| Certificate of Payment (COP) Process |
May 2008 |
|
| Application/Certificate of Payment (COP) FORM (including Pencil Copy) |
May 2008 |
|
| Schedule of Values |
||
| Contractor's Affidavit for Final Payment |
July 15, 2003 |
|
| Consent of Surety Company |
July 15, 2003 |
|
| Waiver of Mechanics' Lien |
May 2008 |
|
| Certification of Compliance with Steel Products Procurement Act |
January 2, 2003 |
|
| DGS Steel Certification Requirements |
July 15, 2003 |
|
| ST-1 Steel Origin Certification: Prime Contractor |
June 1, 1999 |
|
| ST-2 Steel Origin Certification: Non-Identifiable, Non-Structural Steel |
June 1, 1999 |
|
| ST-3 75% U.S. Manufacture Certification |
June 1, 1999 |
|
| ST-4 Not Domestically Manufactured |
June 1, 1999 |
|
| Construction proj Waste Management Plan - SAMPLE |
August 2009 |
|
| Demolition proj Construction Waste Management Plan - SAMPLE |
August 2009 | |
| Demolition proj Site Safety Plan - SAMPLE |
August 2009 | |
| Construction proj Site Safety Plan - SAMPLE |
August 2009 |
.05 Change Order
| Document | Version Date |
Description |
|---|---|---|
| Change Order Process |
July 15, 2003 |
|
| Change Order Summary and Cost Breakdown Form | July 2005 |
|
| Tax Exempt Items |
July 15, 2005 |
|
| ACT 45 Exemption Carve-Out |
January 2, 2003 |
|
| Change Order Letter-SAMPLE 1 |
July 15, 2003 |
Sidney Professional Letter |
| Change Order Letter-SAMPLE 2 |
July 15, 2003 |
Joe Contractor Letter |
| Change Order Summary-SAMPLE |
August 2004 |
|
| Change Order Letter-SAMPLE 3 |
July 15, 2003 |
Bill Subcontractor Letter |
| Cost Breakdown-SAMPLE |
August 2004 |
|
| Change Order Letter-SAMPLE 4 |
July 15, 2003 |
Quick Buck Rental Company |
| Change Order Letter-SAMPLE 5 |
July 15, 2003 |
Speedy Electric Supply Company |
.06 Forms and Certificates
| Document | Version Date |
Description |
|---|---|---|
| Lead-Free Plumbing Material Certification |
January 2, 2003 |
|
| Refrigerant Equipment Installation Form |
July 15, 2003 |
|
| Title V New Emission Source Information |
July 15, 2003 |
|
| Fire Hydrant Meter Lease Request Procedure |
February 2, 2004 |
|
| Hot Work Permit |
June 2004 |
|
| Erosion and Sedimentation Control Inspection Log Sheet |
||
| Utility Interruption Notification Form |
June 2006 |
.07 Stormwater Information
| Document | Version Date |
Description |
|---|---|---|
| When It Rains, It Drains |
||
| Don't Let Storm Water Run Off With Your Time and Money |
.08 Close-Out
| Document |
Version Date |
Description |
|---|---|---|
| Contractor Performance Evaluation Instructions |
2008 |
|
| Contractor Performance Evaluation Form |
2008 |
00 50 00 CONTRACTING FORMS AND SUPPLEMENTS
The documents in this section are provided for use during the project design and construction processes. They are Penn State’s preferred format and we recommend you copy and use them for projects on our campuses.
| Document |
Version |
Description |
|---|---|---|
|
May 2008 |
This form SHALL be used by the Contractor to request payment. There will be no alterations of any kind to this form. | |
| Addenda | July 2002 |
This word document contains the content and format that Penn State expects the Professional to use when issuing Addenda. |
| Web Project Form |
July 2009 |
The Project Leader, Professional, or Construction Manager to post their project(s) to the web shall complete these forms. Completed forms shall be submitted to mlm3@psu.edu. |
| CM Web Project Form |
July 2009 |
The Project Leader, Professional, or Construction Manager to post their project(s) to the web shall complete these forms. Completed forms shall be submitted to mlm3@psu.edu. |
| Bid Tab (blank) |
December 2001 |
This blank excel format template is to assist the Professional in preparing Bid Tabs on all Penn State projects. Prepare Bid Tab two (2) business days before scheduled bid opening and transmit by e-mail to the Contract Administration Office at CA@opp.psu.edu or fax to Contract Administration at (814) 863-7954. Open document for further instructions. |
| Change Order Summary and Cost Breakdown Forms |
August 2004 |
These forms shall be used on all change orders submitted on University projects. The Cost Breakdown Forms are to be completed by the prime contractor and any subcontractor (regardless of tier) performing work under the change order. Contractors and subcontractors are required to submit all supporting documentation along with these forms to support the cost requested. Change orders will not be processed without the correct forms and supporting documentation. |
| Consent of Owner to Use of Contingency |
April 2002 |
This form is to be completed by Construction Managers and approved by Project Managers before use of any contingency funds. |
| Job Conference Meeting Minutes |
December 2007 |
This word document contains the content and format that Penn State expects the Professional to use to record Job Conference minutes. |
| Utility Interruption Notification Form |
November 2007 |
This is a sample form utilized to inform and receive approval from our customers that they will be without certain utilities, Life Safety Systems, or a reduction/outage of HVAC System, due to our technicians performing work to resolve the problem. |
| Weekly Payroll Transmittal |
May 2003 |
This form is utilized by the Contractor(s) for submitting Weekly Payroll |
00 51 00 MISCELLANEOUS FORMS
| Document | Version Date |
Description |
|---|---|---|
| Title V New Emission Source Information |
August 2001 |
The University's Title V permit requires all new emission sources installed be tracked, "permitted" and reported. The professional must provide the information requested as it becomes available (starting with the design process). |
| Environmental Quality Board (EQB) |
April 2000 |
The Professional must submit projects involving proposed changes to the exterior of a building for review during the design process. The following document outlines the procedure for doing this. |
| Utility Demand and Consumption Form |
March 2007 |
The Professional shall complete this form on all their projects. It is used to inform the University of the impact of your project on the distribution system capacity. It needs to the submitted during the Preliminary Design review submission and during the Final Design submission. |
| Design Phase Submittal Requirements |
August 2006 |
This document contains instructions for Design Professionals. It is an outline of the documents needed, decisions required, and issues to be considered at each of the three submittal stages of the Design Phase: Schematic Phase, Preliminary Phase and Construction Document Phase. |
00 52 00 PROFESSIONAL AGREEMENTS
The following documents are examples of the types of Owner-Professional agreements that Penn State will enter into with Professionals who do design work for them. They contain the rights and responsibilities of the parties. These sample documents are for information only. The actual agreement will be provided and completed by the Design and Construction division.
| Document | Version Date | Description |
|---|---|---|
| Form of Agreement 1-P (sample) |
January 2009 |
This form is a sample of the long version form of the Owner-Professional agreement. It is used when Penn State wants full design services. |
| Form of Agreement 1-S (sample) |
October 2009 |
This form is a sample of the short version form of the Owner-Professional agreement. It is used when Penn State wants limited Professional services (for example-a geotechnical report). |
00 53 00 CONSTRUCTION MANAGER AGREEMENTS
| Document |
Version Date |
Description |
|---|---|---|
| CM-GMP General Conditions |
May 2009 |
General Conditions of the CM GMP agreement. |
| Form of Agreement 1-CM-GMP |
May 2009 |
(sample) |
| Form of Agreement 1-CM(SP) |
June 2002 |
(sample) |
| Form of Agreement 1-CM-P |
April 2002 |
(sample) |
00 55 00 EVALUATIONS
00 55 01 Contractor Performance Evaluation
| Document | Version Date | Description |
|---|---|---|
| Contractor Evaluation Form |
January 2008 |
|
| Contractor Evaluation Instructions |
January 2008 |
00 55 02 Professional Performance Evaluation
| Document | Version Date | Description |
|---|---|---|
| AE Professional Evaluation Form |
January 2008 |
|
| AE Professional Evaluation Instructions |
January 2008 |